Do not place fasteners in the seal down strip.
Malarkey roofing installation instructions.
Underlayment is required on roof decks prior to the installation of malarkey shingles.
Install drip edge first along the eaves and later on the rakes once the field underlayment has been applied.
Failure to use properly condi tioned deck materials can result in deck movement which can damage the roof covering and may void your warranty.
Be sure to overlap the eave drip edge too.
Kneeling or standing in front of the roll score the release film all the way across with a straight blade knife taking care not to cut the membrane itself.
System such as leaks and buckling increase if installed directly over wood board decks.
Underlayment malarkey makes two types of underlayment the first being water resistant mechanically attachedfield underlayments right start udl and our secure start.
Install with fasteners placed 1 3 38 76 mm up from the eave one fastener 1 25 mm from each end of the starter and the remaining two 2 evenly spaced on the same line as the end fasteners.
Begin at a lower corner of roof and roll out 2 3 feet of material 610 914 mm.
When re covering an existing shingle roof evaluation of the.
3 malarkey omniseal system installation instructions application in elevated temperatures.
1 malarkey laminate shingle installation instructions.
1 malarkey laminate shingle installation instructions.
Drip edge flashing in accordance with 2015 international building code section 1507 2 9 3 and 2015 international residential building code section r905 2 8 5 install non corrosive 26 gauge sheet.
Malarkey arctic seal is self adhering but this attribute is affected by cold weather and moisture often making it necessary to fasten the underlayment in place until shingles can be applied.
Be sure to overlap the eave drip edge too.
Nailing pattern use four 4 fasteners for each starter shin gle.
Allow arctic seal and malarkey right start udl to relax prior to installation.
To apply the rake drip edge start at the corner near the eave and work your way up lapping subsequent lengths of flashing over the lower pieces by a minimum of 2 51 mm.
Install malarkey laminate shingles according to build ing code and local for the rake drip edge start at the corner near the eave and work your way up lapping subsequent lengths of flashing over the lower pieces by a minimum of 2 51 mm.
Unroll cut into manageable lengths and lay out in the sun.
Residential building code section r905 2 8 5 drip edge flashing drip edge eave or rake metal is required along the eave and rake edges of shingle roofs.